- The Complete Research Material is averagely 50 pages long and it is in Ms Word Format, it has 1-5 Chapters.
- Major Attributes are Abstract, All Chapters, Figures, Appendix, References.
- Study Level: BTech, BSc, BEng, BA, HND, ND or NCE.
- Full Access Fee: ₦5,000
Get the complete project »
ABSTRACT Information Communication Technology (ICT) refers to several forms of information exchange between two or more devices like computers, mobile PDAs and hi-tech devices through which any of the several methods of interconnection, principally through the Internet can be initiated to perform a defined task. These technologies provide speedy, inexpensive, secure and convenient means of communication. Therefore, in developing countries Nigeria precisely, the impact of ICT in the maritime sector for maritime operations and security cannot be over emphasised. It is as a result of this that this research study is determined to assess the impact of ICT on security of Maritime operations. The cross-sectional survey research design, which involves the use of questionnaires and interviews were adopted in this study. Using simple random sampling technique a total of sixty (60)respondents were drawn from Apapa and Tincan Island Ports, Lagos, Nigeria. This design was chosen because it provides appropriate methodology for assessment of security and ICT in the Maritime sector of the nation’s economy.
You either get what you want or your money back. T&C Apply
You can find more project topics easily, just search
-
SIMILAR BUILDING TECHNOLOGY FINAL YEAR PROJECT RESEARCH TOPICS
-
1. AN APPRAISAL OF THE IMPACT OF DELAY IN PROJECT DELIVERY IN CONSTRUCTION INDUSTRY
» CHAPTER ONE INTRODUCTION 1.1 Background of the study It is believed that one of the prevailing problems of construction industry in Nigeria is the imp...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
2. FRAMEWORK FOR IMPLEMENTATION OF GREEN TECHNOLOGY PRACTICES FOR SUSTAINABLE INFRASTRUCTURAL DEVELOPMENT IN AKWA IBOM STATE
» TABLE OF CONTENT CONTENTS PAGE Title Page i Declaration ii Certification iii Dedication iv Acknowledgement v Table of Contents vi List of Tables ix Li...Continue Reading »Item Type & Format: Project Material - Ms Word | 30 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
3. IMPORTANCE OF INCENTIVES IN ENHANCING WORKERS PERFORMANCE IN CONSTRUCTION INDUSTRY
» ABSTRACT This study was based on the importance of incentives in enhancing workers performance on sites, that is, both financial and non financial inc...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
4. ACCESSMENT OF THE COMPRESSIVE STRENGTH OF SANDCRETE HOLLOW BLOCKS MOULDED FROM FOUR (4) DIFFERENT BLOCK INDUSTRIES IN IGABI, CHIKUMAND KADUNA SOUTH LO...
» CHAPTER ONE 1.0 Introduction Sandcrete blocks are composit4e material made up of cement, sand and water moulded into different sizes (Barry 1969). It ...Continue Reading »Item Type & Format: Project Material - Ms Word | 51 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
5. GREEN BUIDING AS INNOVATION IN NIGERIA CONSTRUCTION INDUSTRY
» “It is not easy being green” – Kermit the Frog, (1972). There is no single definition of what constitutes a green building, but it can be loosel...Continue Reading »Item Type & Format: Project Material - Ms Word | 50 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
6. HOUSING PROBLEMS IN A UNIVERSITY TOWN A CASE STUDY OF EKPOMA
» CHAPTER ONE 1.1 INTRODUCTION Housing is generally recognized as on of man’s necessity for his social welfare. In Nigeria, successive national de...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
7. THE EFFECT OF DELAY AND DISTRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECT
» CHAPTER ONE INTRODUCTION Delay as referred in construction is prolonged construction period and disruptions are events that disturb the construction p...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
8. EVALUATION OF INCENTIVE SCHEMES ON LABOUR PRODUCTION IN NIGERIA CONSTRUCTION INDUSTRY.
» CHAPTER ONEINTRODUCTION1.1 Relevance of project1.2 Site inspection1.3 Evolution of road network in nigeria1.4 Motor vehicle characteristic that affect...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
9. SAFETY PROCEDURES AND ACCIDENT PREVENTION METHODS IN CONSTRUCTION SITES
» CHAPTER ONE INTRODUCTION 1.1 Background of the study The importance of the Construction Industry to national economies the world over cannot be over e...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
10. THE ROLE OF CONSULTANT BUILDER IN MINIMIZING CHANGE ORDER IN CONSTRUCTION PROJECTS A CASE STUDY OF PUBLIC BUILDING PROJECT)
» ...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT