- The Complete Research Material is averagely 56 pages long and it is in Ms Word Format, it has 1-5 Chapters.
- Major Attributes are Abstract, All Chapters, Figures, Appendix, References.
- Study Level: BTech, BSc, BEng, BA, HND, ND or NCE.
- Full Access Fee: ₦5,000
Get the complete project »
Abstract
The paper considers the management of materials on building construction sites. In the
study, method of material procurement practice on construction site, factors affecting material management on building construction site as well as causes wastages on construction sites were determined. The study further Suggest measures for effective material management in construction site. Data for the study was obtained through a structured questionnaire administered to respondents in ten different construction sites and head offices of the
construction companies in charge of the sites in the study area. Findings reveal that, 31% of respondents organization procure materials for sites by head office provisions without site requisition, 64% of respondents organization procure materials for sites by head office provisions with site requisition and 5% of respondents organization procure materials for sites by through direct purchase by site manager or engineer. The respondent identified the following as the main causes of material wastage on building construction sites: Damage by mishandling, inadequate storage facilities on site, delay in material supply, inadequate supervision, poor site security, Weather and other natural occurrence, Rework, alteration of designs, over ordering of construction materials, theft and Vandalism. Based on the findings in the work, appropriate recommendations were being made for effective material management on building construction sites.
You either get what you want or your money back. T&C Apply
You can find more project topics easily, just search
-
SIMILAR BUILDING TECHNOLOGY FINAL YEAR PROJECT RESEARCH TOPICS
-
1. FRAMEWORK FOR IMPLEMENTATION OF GREEN TECHNOLOGY PRACTICES FOR SUSTAINABLE INFRASTRUCTURAL DEVELOPMENT IN AKWA IBOM STATE
» TABLE OF CONTENT CONTENTS PAGE Title Page i Declaration ii Certification iii Dedication iv Acknowledgement v Table of Contents vi List of Tables ix Li...Continue Reading »Item Type & Format: Project Material - Ms Word | 30 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
2. CONFLICT MANAGEMENT IN NIGERIAN CONSTRUCTION INDUSTRY.
» CHAPTER ONEINTRODUCTIONBackground of the studyToday‘s construction projects become more complex in nature. The complex,relational and lengthy proces...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
3. AN EVALUATION OF HOUSING AFFORDABILITY FOR NIGER STATE CIVIL SERVANTS UNDER PUBLIC-PRIVATE PARTNERSHIP (PPP) HOUSING DEVELOPMENT
» ABSTRACT Niger state government achievement in Public housing delivery for its citizen since its creation in 1976 has been very minimal–with jus...Continue Reading »Item Type & Format: Project Material - Ms Word | 102 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
4. EFFECT OF AGGREGATE SIZES ON CONCRETE STRENGTH
» CHAPTER ONE INTRODUCTION 1.1 Background of study It is well recognized that coarse aggregate plays an important role in concrete. Coarse aggregate typ...Continue Reading »Item Type & Format: Project Material - Ms Word | 103 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
5. STRUCTURAL DETAILING IN REINFORCED CONCRETE OF A THREE BEDROOM DETACH DUPLEX
» CHAPTER ONE INTRODUCTION The work in the construction industry involves the client, the Architect, the Engineer, the quantity surveyor and the builder...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
6. THE EFFECT OF DELAY AND DISRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECT
» CHAPTER ONE INTRODUCTION Delay as referred in construction is prolonged construction period and disruptions are events that disturb the construction p...Continue Reading »Item Type & Format: Project Material - Ms Word | 60 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
7. Challenges Of Low Cost Housing Delivery In Nigeria (A Case Study Of Imo State)
» ABSTRACT The world of building Industry is very wide and reaches which covers all areas like production, Building maintenance, project management, pro...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
8. THE INFLUENCE OF PUBLIC PROCUREMENT SYSTEM ON CONTRACT PERFORMANCE OF PUBLIC BUILDING PROJECTS DURING IMPLEMENTATION
» ABSTRACT Public procurement system account for significant percentage of GDP and has a directimpact on Kenya economy. Indeed, the Nigerian government ...Continue Reading »Item Type & Format: Project Material - Ms Word | 105 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
9. ASSESSMENT OF PROFESSIONAL’S PERCEPTION ON MATERIALS MANAGEMENT PRACTICES ON CONSTRUCTION SITES IN SELECTED STATES IN NIGERIA.
» CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Material management can be defined as a process that coordinates planning, assessing the requirem...Continue Reading »Item Type & Format: Project Material - Ms Word | 80 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
10. INVESTIGATION ON THE CAUSES OF PAVEMENT FAILURE ALONG HILLVIEW OFF ESBS ROAD ENUGU
» CHAPTER ONE 1.1 INTRODUCTION The site under investigation is Hillview of ESBS Road Enugu. Along the site failures are observed especially depress on p...Continue Reading »Item Type & Format: Project Material - Ms Word | 40 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT