- The Complete Research Material is averagely 52 pages long and it is in Ms Word Format, it has 1-5 Chapters.
- Major Attributes are Abstract, All Chapters, Figures, Appendix, References.
- Study Level: BTech, BSc, BEng, BA, HND, ND or NCE.
- Full Access Fee: ₦6,000
Get the complete project »
CHAPTER ONE:1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms
CHAPTER TWO:2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal control 2.3 Classes of internal control 2.4 Limitations of internal control 2.5 Evaluations of internal control 2.6 Internal control and the auditor 2.7 Public accountability 2.8 Historical overview of the case study 2.9 Internal control and accountability
CHAPTER THREE:3.0 RESEARCH METHODOLOGY 3.1 Research design 3.2 Sources of data 3.3 Area of study 3.4 Population of the study 3.5 Determination of sample size 3.6 Reliability of the instrument 3.7 Validity of the instrument 3.8 Method of data analysis
CHAPTER FOUR:4.0 PRESENTATION OF DATA 4.1 Presentation of data 4.2 Test of hypotheses
CHAPTER FIVE:5.0 SUMMARY OF FINDINGS, CONCLUSIONS AND RECOMMENDATIONS 5.1 Summary of findings 5.2 Conclusions 5.3 Recommendations Bibliography
You either get what you want or your money back. T&C Apply
You can find more project topics easily, just search
-
SIMILAR BUILDING TECHNOLOGY FINAL YEAR PROJECT RESEARCH TOPICS
-
1. AN EVALUATION OF HOUSING AFFORDABILITY FOR NIGER STATE CIVIL SERVANTS UNDER PUBLIC-PRIVATE PARTNERSHIP (PPP) HOUSING DEVELOPMENT
» ABSTRACT Niger state government achievement in Public housing delivery for its citizen since its creation in 1976 has been very minimal–with jus...Continue Reading »Item Type & Format: Project Material - Ms Word | 102 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
2. THERMAL PROPERTIES OF SOME SELECTED MATERIALS USED AS CEILING IN BUILDING
» ABSTRACT This work investigates the thermal properties of Polyvinyl Chloride (PVC), Plaster of Paris (POP), asbestos, and cardboard commonly used as c...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
3. MODELLING THE EFFECTS OF HIGHWAY GEOMETRIC ELEMENTS ON HIGHWAY ACCIDENT
» CHAPTER ONE INTRODUCTION Background Traffic accidents have been recognized as one of the major causes for human and economic losses both in developed ...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
4. ENERGY SUPPLY FOR DOMESTIC USE AND IMPACT ON THE URBAN POOR IN MAKURDI NIGERIA
» Abstract In Nigeria, as many developing countries, providing energy for the population has proven to be a great challenge thereby increasing dependenc...Continue Reading »Item Type & Format: Project Material - Ms Word | 38 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
5. PROJECT PLANNING AND PROGRAMMING AS TOOLS FOR EFFECTIVE PROJECT DELIVERY
» TABLE OF CONTENTSCover Page Title Page Certification Dedication Acknowledgment Abstract Table of Content Chapter One: Introduction1.1 Background of th...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
6. DELAY ANALYSIS IN INDUSTRIAL PROJECTS BY USING RELATIVE IMPORTANCE INDEX METHOD.
» TABLE OF CONTENTSApproval pageDedicationAbstractAcknowledgementTable of contentCHAPTER ONEINTRODUCTION1.1 Relevance of project1.2 Site inspection1.3 E...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
7. COMPARATIVE STUDIES OF RICE HUSK ASH AND COW BONE ASH AS PARTIAL REPLACEMENT OF CEMENT IN CONCRETE
» ABSTRACT It is seen that the rising of construction materials in developing countries has necessitated research into the use of alternative materials ...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
8. EVALUATING THE EFFECTIVENESS OF PROJECT DELIVERY METHODS IN SOUTH-EAST NIGERIA
» ABSTRACT This research studied “evaluating the effectiveness of project delivery methods in South East Nigeria”. There are alternatives de...Continue Reading »Item Type & Format: Project Material - Ms Word | 133 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
9. GREEN BUIDING AS INNOVATION IN NIGERIA CONSTRUCTION INDUSTRY
» “It is not easy being green” – Kermit the Frog, (1972). There is no single definition of what constitutes a green building, but it can be loosel...Continue Reading »Item Type & Format: Project Material - Ms Word | 50 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
10. EVALUATION OF INCENTIVE SCHEMES ON LABOUR PRODUCTION IN NIGERIA CONSTRUCTION INDUSTRY.
» CHAPTER ONEINTRODUCTION1.1 Relevance of project1.2 Site inspection1.3 Evolution of road network in nigeria1.4 Motor vehicle characteristic that affect...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT