ABSTRACT
Construction of building projects is an endeavour that involves capital expenditure, which is either borrowed or self-financed by clients. The expected outcome of such expenditure is value for money, which is usually dictated by project objectives of cost, time and quality. Project cost, as a project objective, is a crucial determinant of project success in the prevailing economic challenges being experienced globally. Construction cost overrun has become a reoccurring phenomenon in the delivery of building projects. The major thrust of this study was to identify, analyse and model the factors that contribute to building construction cost overruns in Abuja. The study adopted a Monte-Carlo technique in simulating cost overrun using DiscoverSim® version 1.1 (SigmaXL, 2013) simulation and RiskAmp Microsoft Excel add-in software to analyse data obtained from literature review, review of project documents with contract sum of over Five Million Naira executed within Abuja city in addition to interview sessions with construction professionals. The study revealed that significant cost overruns are mainly due to re-measurement and variation. The simulation result elucidated that less than 10% of building projects are completed below the initial contract sum in Abuja which could be due to the fact that projects tend to be initiated and executed without adequate project information such as client brief, design details and specifications. The study recommends the need for minimizing occurrence of re-measurement in building projects through provision of full design information prior to contract award, development of simulation model for specific project categories and establishment of a project cost overrun band that will enable a scientific measurement of project’s value for money benchmarked against initial cost estimate.
INTRODUCTION
Globally, the construction sector is inundated with cost overruns in the delivery of building projects. This experience has brought about loss of clients’ confidence in consultants, added investment risks, lack of ability to deliver value to clients, and disinvestment in the construction industry (Mbachu and Nkado, 2004).It is of essence that the objectives of a building contract are met to the contentment of the parties involved. Cost, time and quality are significant, interrelated and interdependent targets for achieving the objectives/goals expected of building contracts (Ashworth, 1999, Gould, 2002). Thus, it is crucial to keep up a proper balance between the three so that project outputs are realised on time, within the financial plan and with the requisite quality (Akinsola and Potts, 1998). However, it is an admitted fact that in Nigeria, the majority of contracts suffer undue time extensions and /or additional cost to the client and /or inadequate quality of work (Oluwole, 2008b).
Project cost overruns can be either avoidable or unavoidable. Overruns due to design plan or project management problems are avoidable because they could have reasonably been foreseen and prevented (Shanmugam et al., 2006). However, there are some unavoidable costs such as those due to unanticipated events which cannot reasonably be prevented. Cost overruns may add value to projects when extra work is done with the intention of producing a better output. Overruns may also add value when they involve work that was omitted from design plans but clearly needed to be done. However, some overruns may not add value and represent wasted money if they do not result in a better product.
Cost overrun of a project refers to the actual ‘cost increase’ to the client during construction of a building project (Janaka, 1992). It is merely the difference between the value originally envisaged for the project and the value reflected in the final certificate. Cost overruns occur from overspending the allowances, making changes and encountering unforeseen problems. Proper planning can greatly reduce cost overruns.
You either get what you want or your money back. T&C Apply
You can find more project topics easily, just search
-
SIMILAR BUILDING TECHNOLOGY FINAL YEAR PROJECT RESEARCH TOPICS
-
1. AN ANALYSIS OF DETERMINANTS OF ACCIDENT INVOLVING MARINE VESSELS IN NIGERIA’S WATERWAYS
» Cases of marine vessel accident involving personal injury, deaths, property and environmental damage have grown in tandem with increased oil prospecti...Continue Reading »Item Type & Format: Project Material - Ms Word | 50 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
2. APPLICATION OF GEOINFORMATIC TECHNIQUES IN CONTROLLING FLOODING IN VULNERABLE ROADS AND BUILDINGS IN NIGERIA
» CHAPTER ONE INTRODUCTION 1.1 Background to the Study The acronym GIS stands for geographic information system, it is a system which allows a capture, ...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
3. AN ASSESSMENT OF CAUSES, EFFECT AND REPAIR OF CRACKS IN BUILDING CONSTRUCTION PROJECT IN IMO STATE
» CHAPTER ONE INTRODUCTION 1.1 Background of Study Buildings are structures, which serve as shelters for man, his properties and activities. They must b...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
4. REHABILITATION OF WALL SURFACE PAINTING TO BUILDING WORKSHOP OF KADUNA POLYTECHNIC,
» ABSTRACT This project work is based on the rehabilitation paint and decorating of external side wall of the workshop including its toilet, its cleared...Continue Reading »Item Type & Format: Project Material - Ms Word | 36 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
5. Challenges Of Low Cost Housing Delivery In Nigeria (A Case Study Of Imo State)
» ABSTRACT The world of building Industry is very wide and reaches which covers all areas like production, Building maintenance, project management, pro...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
6. THE ROLE OF DRY CONSTRUCTION IN ENSURING AFFORDABLE HOUSES IN NIGERIA
» CHAPTER ONE INTRODUCTION 1.1 BACKGROUND TO THE STUDY With Nigeria’s capital expenditure profile put at 24 per cent of recurrent expenditure in 2...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
7. METHOD OF IMPROVING STUDENTS PERFORMANCE IN TECHNICAL SCHOOLS IN NIGER STATE CENTRAL EDUCATIONAL ZONE OF NIGER STATE
» TABLE OF CONTENTS Title page i Approval page ii Declaration iii Dedication iv Acknowledgement v Table of contents vi Abstract viii CHAPTER ONE: INTROD...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
8. MANAGEMENT OF MATERIALS IN BUILDING
» ABSTRACT The control of materials on construction sites is handled carelessly by planning and purchasing departments, site supervisors and engineers a...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
9. AN ASSESSMENT OF THE INFLUENCE OF COMBUSTION GENERATED POLLUTANTS ON THE INDOOR AIR QUALITY OF SELECTED LABORATORIES IN AHMADU BELLO UNIVERSITY ZARIA
» CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF STUDY Interests in the role of air quality in health and disease date back to antiquity. Hippocrates in his...Continue Reading »Item Type & Format: Project Material - Ms Word | 166 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
10. WETLAND CONSERVATION AND RESTORATION IN THE CITY OF NIGERIA
» CHAPTER ONE INTRODUCTION 1.0 Background to the Study The world and Africa in particular are facing serious challenges in the area of environmental deg...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT