PREFACE
This is presentation of information on the detailing of structural members in Buildings. Structural detailing is a branch of structural work that transposes the ideal or works of a Structural Engineer in working drawings for easy utilization in the building construction works. Working drawing are produced by an architect and a structural Engineer for easy use by a contractors.
The processes of detailing put n place was in conjunction with the recommendation of the concrete society and the Institute of Structural Engineers. In building construction, a good interaction and relationship between the architects Structural Engineers, Quantity Surveyors and Contractors are required. The methods, scales, symbols and notations must be stonverdized and understood by all parties involves in a project to immunize risks and communication hindrance.
A structure in broken down into identifiable elements for detailing work like beams, columns, slabs etc which enables the different detailing aspects to be fully addressed and understood.
STRUCTURAL SYMBOLS
The abbreviation recommended for structural detailing works are as follows:-
R.C = Reinforced Concrete
Nog = Drawing
Hor = Horizontal
Vest = Vertical
Dia = Diameter
Fdn = Foundation
Cone = Concrete
Col = Column
Types of Reinforcement
R = Mild steel bars
Y = High yield bars
Comments relating to Reinforcements
L = Centre line
B = Bottom
T = Top
C/c = Centre to centre
TABLE OF CONTENTS CHAPTER
CHAPTER ONE: INTRODUCTION
CHAPTER TWO: DETAILING PROCESSES
CHAPTER THREE: DESIGN, CONDITION, AND SUMMARY
CHAPTER FOUR: REINFORCED CONCRETE
CHAPTER FIVE: ENGINEERS DESIGN SPECIFICATIONS
CHAPTER SIX: DETAILING OF THE ELEMENTS
A FOUNDATION
B COLUMNS
C BEAMS
D SLAB
E STAIRCASE
BIBLIOGRAPHY
CHAPTER ONE
.INTRODUCTION
Before a designer can relate his requirements clearly in construction industry, a drawing is to be prepared, this is because the drawing serve as a general means of communication. Therefore the drawing is adopted mostly, than other means of communication in the Engineering Sectors.
A structural Engineer mostly engages himself in designs on construction of structure, like roads, bridges, railway, dams, building, runway and other public works.
The structural engineer makes initial design, which are usually free – hand sketches of the work. These sketches are used to make clear and neat working drawing, which will be used by the builder of contractor after approval for construction by the authorities involved.
The contributions of a detailer in highly significant to the construction process, for a well detailed drawing is a good medium of reducing the risks of building collapses and to avoid delays arising from doubts and too frequent classifications.
Floor plan 1:75; 1:50
Foundation plan 1:75; 1:50
Elevation 1:75; 1:50
Construction details 1:20; 1:10
Cabinet details 1:50; 1:25
Wall sections 1:20; 1:10
Details of connection, lings 1:5; 1:2
Etc.
PLANS
Plans shall be drawn as transverse section through all structural members immediately above portion of structure under consideration.
ELEVATIONS
Elevations shall be drawn as a vertical section immediately adjacent to the element under consideration. Structural members cut by the section shall be shown in full lines and member behind the section in broken lines.
SECTIONS
Sections shall show only material out by the section plan. The dimension of sections shall be of the left for beams and downward for column. The section shall be drawn as close as possible to the plan or elevation to which it refers and should be described by letters, readable from bottom of the drawing. Section through concrete on drawings may be show as highly shade areas.
GRID LINES
Grid lines provide a reference system for beams and column. It is convenient from top to left corner of the drawing using letters for one direction and numbers for the other.
Gridlines do not necessarily have to be straight or at right angles to each other or actually pass through beams or columns but should be sufficiently class for the reference to be obvious.
Equipment
Pencils and drawing pans
Drawing boards and tee square
Drawing sheet / paper
Set square
Tracing sheet
Lettering grid
Templates
Protractor
You either get what you want or your money back. T&C Apply
You can find more project topics easily, just search
-
SIMILAR BUILDING TECHNOLOGY FINAL YEAR PROJECT RESEARCH TOPICS
-
1. Challenges Of Low Cost Housing Delivery In Nigeria (A Case Study Of Imo State)
» ABSTRACT The world of building Industry is very wide and reaches which covers all areas like production, Building maintenance, project management, pro...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
2. ENERGY SUPPLY FOR DOMESTIC USE AND IMPACT ON THE URBAN POOR IN MAKURDI NIGERIA
» Abstract In Nigeria, as many developing countries, providing energy for the population has proven to be a great challenge thereby increasing dependenc...Continue Reading »Item Type & Format: Project Material - Ms Word | 38 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
3. EFFECT OF OUTSOURCING IN BUILDING FACILITIES MANAGEMENT IN NIGERIA
» CHAPTER ONE INTRODUCTION 1.1 Background to the Study Outsourcing has become one of the most researched areas in management studies due to its rising p...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
4. CONFLICT MANAGEMENT IN NIGERIAN CONSTRUCTION INDUSTRY.
» CHAPTER ONEINTRODUCTIONBackground of the studyToday‘s construction projects become more complex in nature. The complex,relational and lengthy proces...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
5. EFFECT OF PARTIAL REPLACEMENT OF SAND WITH LATERITIC SOIL IN SANDCRETE BLOCKS
» ABSTRACT Of recent, the attention of most researchers is shifting towards the optimization of building materials by using local contents; the use of i...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
6. PROJECT MANAGEMENT AND MAINTENANCE IN LOCAL GOVERNMENT AREAS
» ABSTRACT The research examined factors of effective maintenance management in the public sector. Data gathering and analysis involved personal intervi...Continue Reading »Item Type & Format: Project Material - Ms Word | 95 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
7. IMPACT OF PUBLIC PROCUREMENT SYSTEM ON CONTRACT PERFORMANCE OF PUBLIC BUILDING PROJECTS DURING IMPLEMENTATION
» CHAPTER ONE: Introduction 1.1 Background of the Study Public procurement system has been utilised as an important tool for achieving economic, social,...Continue Reading »Item Type & Format: Project Material - Ms Word | 74 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
8. THE INFLUENCE OF NATIONAL CULTURE ON WORKERS SAFETY CLIMATE IN THE NIGERIAN CONSTRUCTION INDUSTRY
» ABSTRACT The research explored and analyzed the influence of national culture on workers safety climate in the Nigeria construction industry. It ident...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
9. ASSESSMENT OF THE MAINTENANCE OF FACILITIES IN BUILDING TECHNOLOGY WORKSHOPS IN TECHNICAL COLLEGES IN ZONE TWO KADUNA STATE
» TABLE OF CONTENT Cover page Title page ...Continue Reading »Item Type & Format: Project Material - Ms Word | 132 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT
-
10. THE INFLUENCE OF PUBLIC PROCUREMENT SYSTEM ON CONTRACT PERFORMANCE OF PUBLIC BUILDING PROJECTS DURING IMPLEMENTATION
» ABSTRACT Public procurement system account for significant percentage of GDP and has a directimpact on Kenya economy. Indeed, the Nigerian government ...Continue Reading »Item Type & Format: Project Material - Ms Word | 105 pages | Instant Download | Chapter 1-5 | BUILDING TECHNOLOGY DEPARTMENT