- The Complete Research Material is averagely 50 pages long and it is in Ms Word Format, it has 1-5 Chapters.
- Major Attributes are Abstract, All Chapters, Figures, Appendix, References.
- Study Level: BTech, BSc, BEng, BA, HND, ND or NCE.
- Full Access Fee: ₦6,000
Get the complete project »
ABSTRACT
This project is mainly concerned with the presentation of information basically on the structural detailing of reinforced concrete members of a story building, in a sloppy land with a retaining wall. Structural detailing is a branch of structural work that transposes the idea of works of a structural engineer into working drawings for easier utilization in the building construction. Working drawings are drawings produced by engineers for easy execution of a plan by builders.
The drawing also shows the interrelationship between the architectural and the engineering design, it shows all the construction detail properly as they relate to the other with no attempt of separation of diverse materials.
TABLE OF CONTENTS
Cover page
Title page
Approval page
Dedication
Acknowledgement
Preface
Table of contents
Structural symbol
CHAPTER ONE
Introduction of Project
CHAPTER TWO
2.0 Detailing process
2.1 Reinforcement size
2.2 Notation of drawing
2.3 Identification of bars
2.4 Bar bending schedule
2.5 Type of drawing
2.6 Profile drawing and reinforcement drawing
2.7 Detailed drawing
2.8 Drawing size, and margin and panels
2.9 Thickness of line lettering and sapling
2.10 Dimension and scales
2.11 Plan, elevation, section, grid lines
2.12 Equipment
CHAPTER THREE
3.0 Retaining wall
3.1 Small height retaining wall
3.2 Cantilever retaining wall
3.3 Retaining wall for basement
CHAPTER FOUR
Project
CHAPTER FIVE
5.0 Engineering specification
5.1 Floor slab and beam and staircase
CHAPTER SIX
6.0 Detail of the element
6.1 Foundation column
6.2 Kicker and beam
6.3 Slab
6.4 Stair case
Bibliography
You either get what you want or your money back. T&C Apply
You can find more project topics easily, just search
-
SIMILAR CIVIL ENGINEERING FINAL YEAR PROJECT RESEARCH TOPICS
-
1. SOIL STABILIZATION METHODS AND MATERIALS
» TABLE OF CONTENTS PREFACE............................................................................................................................ ...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | CIVIL ENGINEERING DEPARTMENT
-
2. DRILLING FLUID ADDITIVE: AN OVERVIEW, HISTORY OF LOCAL CONTENT DRILLING FLUID ADDITIVE CONSIDERING GUM ARABIC
» CHAPTER ONE 1.0 INTRODUCTION Drilling mud is a flowing fluid applied in rotary drilling for achieving single or multiple tasks during the procedure, a...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | CIVIL ENGINEERING DEPARTMENT
-
3. GEOMETRIC DESIGN OF HIGHWAY
» CHAPTER ONE 1. INTRODUCTION 2. Since the attainment of independence, Nigeria has witnessed rapid economic and social development, which has open up th...Continue Reading »Item Type & Format: Project Material - Ms Word | 69 pages | Instant Download | Chapter 1-5 | CIVIL ENGINEERING DEPARTMENT
-
4. AQUIFER CHARACTERISTICS IN UYO METROPOLIS: A CASE STUDY OF ITIAM ETOI, ANUA OFFOT AND IBOKO OFFOT
» ABSTRACT The description and location of the geologic formations and water bearing zones within the study area are discussed. The geologic aquifers in...Continue Reading »Item Type & Format: Project Material - Ms Word | 58 pages | Instant Download | Chapter 1-5 | CIVIL ENGINEERING DEPARTMENT
-
5. BLENDING SOIL AGGREGATES TO MEETSUBGRADE OR SUB-BASE CRITERIA USING GRADATION METHOD
» TABLE OF CONTENTS CERTIFICATION.. i DECLARATION.. ii DEDICATION.. iii ACKNOWLEDGEMENT.. iv TABLE OF CONTENTS. v LIST OF TABLES. x LIST OF FIGURES. xii...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | CIVIL ENGINEERING DEPARTMENT
-
6. CURBING CORRUPTION IN PUBLIC PROCUREMENT PROCESS IN NIGERIA
» ABSTRACT This study examines the procurement process in Nigeria with a view to assessing the procurement act, as well as investigating the effects of ...Continue Reading »Item Type & Format: Project Material - Ms Word | 117 pages | Instant Download | Chapter 1-5 | CIVIL ENGINEERING DEPARTMENT
-
7. POLLUTION PROBLEMS AND AN ENGINEERING APPROACH TO THE MANAGEMENT AND CONTROL OF INDUSTRIAL EFFLUENTS IN OTTA, NIGERIA
» ABSTRACT This study examined the effects of effluent discharges from various point loads on a purposively selected receiving river, the self recovery ...Continue Reading »Item Type & Format: Project Material - Ms Word | 291 pages | Instant Download | Chapter 1-5 | CIVIL ENGINEERING DEPARTMENT
-
8. CAUSES, PREVENTION AND TREATMENT OF DAMP ON BUILDING IN MAKOKO AREA OF YABA LOCAL GOVERNMENT IN LAGOS STATE
» ABSTRACT It has been clearly identified that one of the agent that easily deteriorate building structure, weaken the strength of the component of buil...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | CIVIL ENGINEERING DEPARTMENT
-
9. IMPROVEMENT OF BEARING CAPACITY OF SANDY SOIL BY GROUTING
» CHAPTER ONE 1.0 INTRODUCTION The construction of structure on weak ground often requires the soil to be improved in order to ensure the safet...Continue Reading »Item Type & Format: Project Material - Ms Word | 50 pages | Instant Download | Chapter 1-5 | CIVIL ENGINEERING DEPARTMENT
-
10. INFLUENCE OF (COATED) STIRRUPS ON OVERLAPPED SPLICE STRENGTH OF EPOXY COATED DEFORMED BARS.
» NOTATION ld Development length MU Ultimate test bending moment Q Applied load BS Ultimate bond stress recommended in BS 8110 : 1997 cal Theoretical bo...Continue Reading »Item Type & Format: Project Material - Ms Word | 40 pages | Instant Download | Chapter 1-5 | CIVIL ENGINEERING DEPARTMENT