- The Complete Research Material is averagely 52 pages long and it is in Ms Word Format, it has 1-5 Chapters.
- Major Attributes are Abstract, All Chapters, Figures, Appendix, References.
- Study Level: BTech, BSc, BEng, BA, HND, ND or NCE.
- Full Access Fee: ₦6,000
Get the complete project »
Among several power system components, transmission line is one of the most important components of the power system network and is mostly affected by several types of faults. Generally, 80%-90% of the fault occurs on the transmission line and the rest of substation equipment and bus bar combined. The necessary requirement of all the power system is to maintain reliability of operation which may be done by detecting, classifying and isolating various faults occurring in the system. It is required that a corrective decision should be made by the protective device to minimize the period of trouble and limit outage time, damage and related problems. If any fault or disturbances occurred in the transmission is not detected, located, and eliminated quickly, it may cause instability in the power system and causes significant changes in system quantities like over-current, under or over voltage, power factor, impedance, frequency and power. The appropriate percentage of occurrence of single line to ground fault is about 70-80%, line to line to ground faults is 10-17%, line to line fault is 8-10% and three phase is 3%. The three faults occur rarely but if it exists in a system it is quite expensive.
You either get what you want or your money back. T&C Apply
You can find more project topics easily, just search
-
SIMILAR ELECTRICAL ENGINEERING FINAL YEAR PROJECT RESEARCH TOPICS
-
1. CONSTRUCTION OF A MICROCONTROLLER BASED T-JUNCTION TRAFFIC LIGHT CONTROLLER
» ABSTRACT T junction traffic light controller is such a device that will play a significant role in controlling traffic at junctions, to ease the expec...Continue Reading »Item Type & Format: Project Material - Ms Word | 50 pages | Instant Download | Chapter 1-5 | ELECTRICAL ENGINEERING DEPARTMENT
-
2. COMPUTER BASED ANALYSIS OF ELECTRICAL POWER SYSTEM FOR THE PURPOSE OF STABILITY STUDIES
» ABSTRACT This report is on stability study in electrical power system. The ability of an electric power system to reestablish the initial state (or on...Continue Reading »Item Type & Format: Project Material - Ms Word | 26 pages | Instant Download | Chapter 1-5 | ELECTRICAL ENGINEERING DEPARTMENT
-
3. CONSTRUCTION OF MICROCONTROLLER BASED VEHICLE SPEED ALARM.
» ABSTRACT The project is based on Construction of microcontroller vehicle speed alarm system which automatically warns the driver by activating a panic...Continue Reading »Item Type & Format: Project Material - Ms Word | 52 pages | Instant Download | Chapter 1-5 | ELECTRICAL ENGINEERING DEPARTMENT
-
4. MICROCONTROLLER BASED DOT MATRIX ADVERT DISPLAY SYSTEM
» CHAPTER ONE INTRODUCTION The purpose of this project is to produce a narrative description of the design and construction of a microcontroller based d...Continue Reading »Item Type & Format: Project Material - Ms Word | 64 pages | Instant Download | Chapter 1-5 | ELECTRICAL ENGINEERING DEPARTMENT
-
5. DESIGN AND CONSTRUCTION OF AN ELECTRONICS DEVICE THAT CAN BE USED IN MEASURING THE TEMPERATURE AND HUMIDITY OF AN ENVIRONMENTCTION
» CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF STUDY Temperature is a numerical measure of hotness and coldness in a body that is in its own state of inte...Continue Reading »Item Type & Format: Project Material - Ms Word | 38 pages | Instant Download | Chapter 1-5 | ELECTRICAL ENGINEERING DEPARTMENT
-
6. CONSTRUCTION OF AUTOMATIC WATER LEVEL CONTROLLER FOR BOTH OVERHEAD AND UNDERGROUND TANKS
» CHAPTER ONE INTRODUCTION 1.0 BACKGROUND The project “automatic water level control with an automatic pump control system” is design to mon...Continue Reading »Item Type & Format: Project Material - Ms Word | 70 pages | Instant Download | Chapter 1-5 | ELECTRICAL ENGINEERING DEPARTMENT
-
7. MOTIVATION AND PRODUCTIVITY IN THE POWERHOLDING COMPANY OF NIGERIA, PLC (PHCN) ENUGU
» ABSTRACT 'The greatest problem confronting some managers is the question of how to make employees perlorm better. Performance is achieved through caus...Continue Reading »Item Type & Format: Project Material - Ms Word | 200 pages | Instant Download | Chapter 1-5 | ELECTRICAL ENGINEERING DEPARTMENT
-
8. DESIGN AND CONSTRUCTION OF AUTOMATIC CHANGEOVER SWITCH WITH INDICATOR
» CHAPTER ONE INTRODUCTION Industrial automation and control has contributed immensely to the high rate of the world’s technological growth. Power...Continue Reading »Item Type & Format: Project Material - Ms Word | 48 pages | Instant Download | Chapter 1-5 | ELECTRICAL ENGINEERING DEPARTMENT
-
9. REMOTE PATIENT MONITORING SYSTEM
» ABSTRACT This thesis has to do with the transfer of medical records taken remotely to a doctor via GSM wireless communication link. Specifically it ma...Continue Reading »Item Type & Format: Project Material - Ms Word | 170 pages | Instant Download | Chapter 1-5 | ELECTRICAL ENGINEERING DEPARTMENT
-
10. EVALUATION OF THE POTENTIALS OF LARGE SCALE PHOTOVOLTAIC POWER GENERATION FOR RURAL ELECTRIFICATION IN NIGERIA
» ABSTRACT The potentials of large scale solar photovoltaic power generation in Sokoto State, North Western Nigeria and Port Harcourt, Southern Nigeria ...Continue Reading »Item Type & Format: Project Material - Ms Word | 65 pages | Instant Download | Chapter 1-5 | ELECTRICAL ENGINEERING DEPARTMENT